The Kelsey Ayer Station
LEED Gold
San Jose, California
About the Project
The Kelsey Ayer Station is a new, vibrant, affordable community that brings together people of all backgrounds, incomes and abilities as neighbors.
The Kelsey Ayer Station is The Kelsey’s first housing community. The development is accessible for residents with a diverse range of access needs, affordable to residents at the lowest income levels, and inclusive of people with and without disabilities.
The Kelsey Ayer Station is a fully inclusive mixed-ability, mixed-income housing community located in a transit-oriented neighborhood blocks north of downtown San Jose. The 115 apartment homes include a mix of 2-bedrooms and studios for individuals with and without disabilities across a range of incomes. The project features shared community amenities and outdoor spaces. The Inclusion Concierge connects residents to each other, the community, and desired services and supports.
LEED for Homes | |
---|---|
The Kelsey Ayer Station | |
San Jose, CA | |
LEED for Homes v4 Gold | |
2016 CA Energy Code - 27.1% better than code | |
Gold | 69.5 |
Integrative Process | 1/2 |
Location and Transportation | 15/15 |
Sustainable Sites | 1.5/7 |
Water Efficiency | 7/12 |
Energy and Atmosphere | 31/37 |
Materials and Resources | 2/9 |
Indoor Environmental Quality | 8/18 |
Innovation | 1/6 |
Regional Priority | 3/4 |
Certified 35 pts, Silver 50 pts, Gold 65 pts, Platinum 80+ points |
Project Details
Developer | Sares Regis of Northern California |
---|---|
Architect | Devcon Construction |
Contractor | Devcon Construction |
BGS Role | Energy Consultant, LEED for Homes Green Rater |
Project Type | 100% affordable and inclusive for people with special needs |
Number of units | 115 Units |
Square footage (Gross) | 87,575 sq.ft. |
Completion Date | August 2024 |